Акселераторы и гранты для стартапов

The Team Section When the Team Is Two People

Подписывайтесь на нас в Instagram

Every reviewer who opens a two-person application reads the team section first and reads it differently than they read a twelve-person one. They are not checking whether you have enough people. They are checking whether the two people in front of them can actually produce the specific deliverable the programme is paying for. Get that wrong and the rest of the application does not matter.

What the question is actually testing

Different programmes are testing different things, and the wording of your team section should change accordingly. Base Builder Grants, which pay out 1 to 5 ETH, want to see that you can ship on Base specifically, not that you've shipped somewhere generically on Ethereum. SSV Network Grants Program, with a $5M pool behind it, is testing distributed validator technology fluency, and a team section that doesn't mention DVT by name reads as a mismatch, not as modesty.

Government-adjacent programmes test something else entirely: can you execute against a Phase I commercialization plan. The Alaska SBIR/STTR Grant Program, up to $125,000 and non-dilutive, and the MassVentures START Grant, $100,000 to $500,000 and also non-dilutive, both want a team section that reads like a delivery plan, because that's what a reviewer with a government mandate has to defend internally.

Prior work, not titles

"CTO" tells a reviewer nothing when there are two of you. What tells them something is: shipped a validator client that ran in production for six months, or closed three paid pilots before writing a line of the current product. If you are applying to something milestone-gated like the Flare Grants Program, where funds are released per milestone under a grant agreement, your prior work section should already read like a milestone log, because that is the exact muscle the reviewer is checking for.

The same logic applies to Fireblocks Blockchain Grants for Web3 Innovation & Ecosystem Growth, where the grant is capped at 25% of the client's annual fees paid to Fireblocks. That structure only pays out once you have real client volume on the platform, so a team section that leads with degrees instead of integration history is wasting the reviewer's time.

When naming an adviser helps, and when it hurts

Naming an adviser works when the programme structure already assumes outside input at specific checkpoints. The Flare Grants Program's milestone agreement is exactly that kind of structure, and so is anything reviewed in rounds rather than against a single deadline, like Starknet Seed Grants, up to $25,000 in STRK with no fixed deadline and ongoing rounds. An adviser attached to a milestone review reads as process, not as a crutch.

It hurts when you name an adviser to cover a capability the core team doesn't have and the programme expects the core team to have it directly. A reviewer for Circle Developer Grants, where funding is tiered to meaningful USDC integration and the first 2026 cohort has already been selected on a rolling basis, is not going to credit an advisory relationship for work that has to happen inside your own codebase. Say what the two of you did. Mention the adviser once, by what they specifically unblocked, and move on.

The gap you can't cover yet

Two-person teams almost always have a build gap, a go-to-market gap, or both. Naming it directly, with a date by which you plan to close it, reads as competence. Hiding it reads as either inexperience or dishonesty, and reviewers who read hundreds of these applications a year spot the hedge instantly.

  • If the gap is build capacity, the Business Chain MVP Grant, up to $10,000 in development services delivered in-kind, exists specifically for the team that has the product vision and not the engineering hours. Naming that gap in the application is the application.
  • If the gap is AI tooling or voice features you can't build in-house yet, the ElevenLabs Grants Program, more than $5,500 in value and reviewed on a rolling basis with no fixed deadline, gives you room to say 'we plan to integrate this by Q2' instead of pretending the capability already exists.
  • If the gap is matched non-dilutive funding tied to a Phase I SBIR award, say so plainly. The HTDC Hawaii SBIR Matching Grant covers up to 50% of that Phase I award specifically because reviewers expect the gap, not because they expect you to have already closed it.

If you are choosing which of these to apply to first, pick the one whose structure matches the gap you actually have, not the one with the biggest headline figure. A team section that admits a gap and names the programme built to close it reads as more credible than a team section that claims two people can do everything, and most reviewers have seen enough of the second kind to distrust it on sight.